Ph.D and MS.c Theses, since 1988.
No. |
Student's Name |
Graduation Year |
Degree |
Abstracts |
ResearchName |
| 1 |
Sigal Nir-Goldenberg |
2013 |
PhD |
|
Dynamic Delineation and Multi-Criteria Evaluation of Green Landscape Corridor Alternatives |
| 2 |
Irina Brodetskaia |
2012 |
PhD |
Abstracts
|
Implementation of Lean Principles for Real-Time Stabilization of Flow in Construction Operations |
| 3 |
Erez Latner |
2012 |
MSc |
Abstracts
|
Applying the Analytic Hierarchy Process for the Selection of General Contractors for Construction Projects |
| 4 |
Amit Wicnudel |
2012 |
MSc |
Abstracts
|
Laser Scanning Based Modeling of Construction Sites for Tower Crane Blind-Lift Analysis |
| 5 |
Gabriel Raviv |
2012 |
MSc |
Abstracts
|
Identification and Analysis of Mechanisms for Constructability Knowledge Transfer from Contractors to Designers |
| 6 |
Efraim Yona |
2011 |
MSc |
Abstracts
|
Factors Affecting the Selection of Forming Systems and other Major Equipment for Multistory Building Construction |
| 7 |
Rebecca Partouche |
2010 |
MSc |
Abstracts
|
A Lean Model for Construction Management of Tall Office/Commercial Buildings |
| 8 |
Meir Simcha |
2006 |
MSc |
Abstracts
|
Quantitative-Comparative Evaluation of Safety Risk at Construction Sites with Tower Cranes |
| 9 |
Dory Telem |
2005 |
PhD |
Abstracts
|
The Work of Construction Project Managers - Its Characteristics and Implications for the Principles of Managing Projects in a Dynamic Environment |
| 10 |
Beniamin Lyachin |
2004 |
MSc |
Abstracts
|
Detection and Analysis of Safety Hazards at Construction Sites with Tower Cranes |
| 11 |
Mordechay Shriki |
2003 |
MSc |
Abstracts
|
Investigation of Tower-Crane Cycle Times as a Basis for Productivity Improvement in Construction Projects |
| 12 |
Marat Goldenberg |
2003 |
MSc |
Abstracts
|
Analytic-Hierachy-Process-Based Model for Equipment Selection in Construction Project |
| 13 |
Yoram Raz |
2001 |
MSc |
|
Comparative Analysis of Shoring-Tower-Based Support Systems for Concrete Elements |
| 14 |
Yoram Shchorri |
2000 |
MSc |
|
Rebar Constructability System |
| 15 |
Dov Goldfinger |
1996 |
MSc |
|
Model for Determining Assembly and Dismantling Work Inputs Of High Shoring Towers |
| 16 |
Jonathan Gilad |
1993 |
MSc |
|
Production and Ereltion of Portable |
| 17 |
Yitzhak Goren |
1993 |
MSc |
|
The Duration of Construction Projects |
Last updated on: Tuesday ,May 14, 2013
|